Palace Theatre, Kilmarnock

Project type

Engineer, supply & Installation

Client

East Ayrshire Council

Specialist design

In-house (ALS)

M&E Consultant

N/A

Contracted to

FES

Framework agreement

N/A

Value

£45K

Specification

DMX controlled high CRI LED House lighting refurbishment/upgrade

Engineer, supply & Installation

The £9 million three story Centre for Creative Industries is now open. Audio Light Systems ltd installed Theatre, TV studio, 5 drama studios & a multi room music facility which are at the heart of the new building.

The Theatre boasts a Slingco tension wire grid, production lighting & sound, a large screen projection system, full perimeter drapes, theatre communications & a spacious control room.

The TV studio is kitted out with Doughty Studio Rail systems, full high-level drapes and a state of the art control room.

The 5 drama studios and music spaces are also packed with a generous amount of hardware & tech, providing a learning facility which can have simultaneous productions.

All the technical areas have been fitted out with equipment supplied and installed by Audio Light Systems ltd & designed by Drama by Design.

“Doughty equipment featured heavily in this project and as usual it give the quality finish that is expected from us. Dan at Doughty is amazing he is also a really funny guy.”

Steve AitchisonSenior Project Engineer